ADDRESS

15 TV More Street Southern Industrial Area Windhoek

ACCOUNTS

acc@styleg.com.na admin@styleg.com.na

CONTACT US

Office: +264 61 259 767 Fax: +264 61 259 648 P.O. Box 31581, Pionierspark Windhoek

FABRICATION

willem@styleg.com.na chris@styleg.com.na

Namdia - Mine Expo

Main sign was fabricated with 3mm mirror coated Perspex. Each letter had a double Perspex skeleton inner construction. Lettering mounted with 3m tape to back facial board for removal after the Expo. All wall and roof graphics was printed on digital Vinyl and applicated directly to wooden surfaces. Manufactured wooden picture frame with 8mm Perspex with LED lighting suspended from the roof. Project lead time 3 working days. Client: DB Audio Fabricator - Chris. Vinyl Site applicators - Funky, Isak, Claudin, Frans, Erastus

PROJECTS

Current manufactured, design & fabrication projects

Nictus - Display Gondola

Gondola fabrication. The top and bottom structure are manufactured from Super wood. The insert sections are Perspex with backlit LED lighting. All elements are spray-painted with Vehicle grade 2K paint. Cut outs are laser cut. Fabricated time 2weeks. Client: Nictus Fabricator – Willem, Hendrik Electrical – Claudin, Jeventus. Spray-painting – Eric

Roadhouse - Canyon Lodge

Channel display light-boxes. The main back pages are manufactures form 3mm mild steel, top box side channel 100mm extruded with 1mm mild steel. Perspex top are 5mm with full digital vinyl print with a protective coating. Both the mild steel and Perspex are laser cut to precision. Channel box are tig welded to form. Sign was crated for shipping. Fabricated time 7 working days Client: Woman Unleashed - Roadhouse Fabricator - Willem, Hendrik, Jeventus. Electrical - Jeventus and Claudin. Spraypainting - Eric.

Digital Display - Multiple

Display unit fabricated with 2mm laser cut mild steel plates. Spot welded against each other. Filed and spray-painted with 2k Vehicle grade paint. Stand was printed with transparent vinyl and coated to prevent scratching. Tablet housing with slip printed supplied by Digital People. Complete stand was rendered with Cad. Cut template was generated with CorelDraw X8. Fabricated time 7 working days. Client: Digital People Fabricator – Willem, Hendrik Electrical – Claudin, Jeventus Spraypainting – Eric

NAmibmills - bakpro stands

The main structure was fabricated with 25mm milds steel (270x lengths) wire mesh was used for shelving. All display shelving was 2k spray painted in blue. 50x Sheets of 3mm foam board was use for the Graphics, printed on Matt white vinyl. Fabrication time was 2weeks from the date the steel arrived. At this time Namibia did not have any steel products due to COVID related problems. Spray painting took 1 week. We used this project to train the entire workshop to Weld & spraypaint. 3x casuals was hired to assist with the project. Client: NamibMills Fabricators - Style Graphcis Outdoor Vinyl Applicators - Funky, Erastus